Wednesday, May 5, 2010

PROJECT 5: EXHIBITION

PROJECT 5: EXHIBITION

Issued 02Apr10. Due 05Apr10.


WE ARE COMBINING ALL PROJECT 01, 02, 03 AND 04 INTO ONE A1 SHEET FOR PREPARATION OF THIS EXHIBITION. MY PERSONAL LANDMARK IS BUILT BASED ON THE 'CHESS' IN CONJUNCTION WITH THE EXHIBITION THEME 'BLACK & WHITE'. MY A1 PRESENTATION BOARD OF A SUMMARY OF ALL THE PROJECTS WE'VE DONE IN THIS SEMESTER IS MADE IN A 3D EFFECT. RISING THE PLATFORM ATTACHED WITH PROJECT PICTURES ON IT, AND LEAVING THE REST UNDONE. EVERY CORNER ON THE BOX SHOWS ONE OF THE PROJECT PRODUCT PICTURES.

WE WERE ALSO ASKED TO EXPLAIN AND DEFINE OUR TRANSFORMATION.

MY TRANSFORMATION STANDS FOR:

ALTERATION OF FORM, DESIGN AND FUNCTION FROM THE ASPECT OF THINKING, FEELING AND DOING.



PHOTOS OF OTHER'S A1 BOARD EXHIBITION

PROJECT 4C: INDIVIDUAL UNIT & PROJECT 4D: PROJECT SYNOPSIS

PROJECT 4: STANDALONE COMMUNITY


4C: INDIVIDUAL UNIT

APEX FLYING FOX

Issued 01Mar10. Due 02Apr10.


THE THIRD PART OF PROJECT 04 IS TO CONSTRUCT OUR INDIVIDUAL AND TO LOCATE IT ON THE STUDIO MASTER MODEL. MY PART OF THE SITE THAT I’M RESPONSIBLE OF IS TO REFINE THE EXISING FLYING-FOX STRUCTURE IN HARAPAN.


THE DRAWING PART WAS DONE USING SKETCH UP 7 AND AFTER THAT, A MODEL IS MADE



4D: PROJECT SYNOPSIS

Issued 01Mar10. Due 02Apr10.


PROJECT 1 PET & HOME SYNOPSIS


PROJECT 2 ONE-FUNCTION SPACE SYNOPSIS


PROJECT 3 ENVELOPE/ SHELL/ SKIN/ COVERING SYNOPSIS


PROJECT 4 STANDALONE COMMUNITY SYNOPSIS


PROJECT 4B: GROUP LAYOUT & LAYOUT MODEL

PROJECT 4: STANDALONE COMMUNITY

4B: GROUP LAYOUT & LAYOUT MODEL

Issued 01Mar10. Due 02Apr10.


AFTER DOING THE MASTER MODEL, EACH GROUP WAS ASSIGNED TO COME OUT WITH THREE PROPOSED LAYOUT BASED ON THE ORIGINAL SITE. WE ARE ABLE TO INSERT DIFFERENT FACILITIS ON THE SITE.


OUR KEY PLAN, LOCATION PLAN AND SITE PLAN.



OUR TEAM PROPOSED LAYOUT INCLUDED THE SIGNBOARD, GATEWAY, GAZEBO, FOUNTAIN AND PATHWAY. WE ALSO DEFINED THE ZONES ON THE SITE INTO COMMERCIAL, RESIDENTIAL, RECREATIONAL AND INSTITUTIONAL ZONES.





THE CONCEPT PLANS


THE PROPOSED LAYOUT





Tuesday, May 4, 2010

PROJECT 4: STANDALONE COMMUNITY


PROJECT 4: STANDALONE COMMUNITY

4A: MASTER MODEL & SITE ANALYSIS

Issued 01Mar10. Due 02Apr10.


THE FIRST PART OF PROJECT 04 STARTED WITH DOING SITE ANALYSIS ON OUR SITE, TASIK AMAN AND TASIK HARAPAN, USM.




THIS IS OUR VISITED SITE, IN TASIK AMAN AND TASIK HARAPAN AREA OF USM.


THEN, A ONE STUDIO MASTER MODEL OF THE SITE IS MADE. WHILE DOING THE MASTER MODEL, THE STUDIO WAS DIVIDED INTO FOUR TEAMS WHICH ARE THE LAND TEAM, BUILDING TEAMS, SCAPE TEAM AND REPORT TEAM. I WAS UNDER BUILDING TEAM AND WAS RESPONSIBLE ON DOING THE BUILDING MODEL ON TH SITE.


WE STARTED OUR WORK BY DOING THESE BUILDINGS MODEL.


THE ROAD

THE BUILDINGS


THE LAKE


OUR FINISHED ONE-STUDIO MASTER MODEL